WHAT ACTUALLY DRIVE CONSTRUCTION PROJECT PERFORMANCE FROM OPERATIONS MANAGEMENT PERSPECTIVE

Rachmad Irwanto

Abstract


Construction industry is always an interesting discussion topic. Some have it approached from its planning and scheduling view accommodating risk analysis. Other interesting topics related to construction industry are its business model, organization and operations. The author argues that construction is a function of them all. An emphasized study on a specific topic above would be less relevant given the fact that construction industry is highly fragmented. From literature review, factors such project integration, communications, knowledge and understanding, human resources, safety, financial, and cost management drive more significant impact on project scheduling performance


Keywords


project scheduling, risk management, construction management, performance, operations

Full Text:

PDF

References


E. Elinoff, M. Sur and B. S. A. Yeoh, "Constructing Asia: An introduction," City; analysis of urban trends, culture, theory, policy, action | DOI: 10.1080/13604813.2017.1374777, vol. 21, no. 5, pp. 580-589, 2017.

R. Irwanto, "Why IRR is not the right measure for return analysis and What’s then?," ICECREAM [International Conference on Engineering, Construction, Renewable Energy, and Advanced Materials]; 2021, vol. 1, p. 13, 2021.

W. Herroelen, "Project Scheduling—Theory and Practice," Production And Operations Management; doi.org/10.1111/j.1937-5956.2005.tb00230.x, vol. 14, no. 4, pp. 413-432, 2005.

N. McCarthy, "Infographics," Statista, 1 Oct 2018. [Online]. Available: https://www.statista.com/chart/3052/over-budget-construction-projects-in-comparison/. [Accessed 4th June 2022].

P. M. I. Inc., Project Management Institute: A Guide to the Project Management Body of Knowledge (PMBOK Guide 5th Edition), 2013.

C. Koch, "Operations management on the construction site - developing a human resource and knowledge oriented alternative to lean construction," 20th Annual ARCOM Conference, vol. 2, p. 1017, September 2004.

H. Lidelöw and K. Simu, "Understanding construction contractors and their operations strategies," Procedia Economics and Finance 21; 10.1016/S2212-5671(15)00149-5, pp. 48 - 56, 2015.

WIKIPEDIA, "Financial crisis of 2007–2008; WIKIPEDIA," [Online]. Available: https://en.wikipedia.org/wiki/Financial_crisis_of_2007%E2%80%932008. [Accessed 17 06 2022].

G. Norouzi, M. Heydari, S. Noori and M. Bagherpour, "Developing a Mathematical Model for Scheduling and Determining Success Probability of Research Projects considering complex-Fuzzy Networks," Journal of Applied Mathematics - doi.org/10.1155/2015/809216, 2015.

D. Tong and Y. Wang , "Summary of Application of Fuzzy Mathematics in Construction Project Management," World Journal of Engineering and Technology, DOI:10.4236/wjet.2021.93028 , vol. 9, no. 3, pp. 407-422, 2021.




DOI: https://doi.org/10.24853/ijcei.2.1.32-40

Refbacks

  • There are currently no refbacks.


International Journal of Civil Engineering and Infrastructure (IJCEI) Indexing By:

  


Copyright of International Journal of Civil Engineering and Infrastructure (IJCEI) (e-ISSN: 2776-2580).

 

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License

Powered by Puskom-UMJ