VALUE STREAM MAPPING FOR WASTE IDENTIFICATION IN THE LOW COST HOUSE CONSTRUCTION PROCESS (CASE STUDY: XYZ HOUSING
Abstract
XYZ housing is a low cost housing created by developers with low-income individuals in mind. However, a lot of individuals bemoan the state of their houses because of flaws like leaks, peeling paint, and other issues. This is unquestionably connected to the way the contractor handled the construction process. When there are signs of waste, particularly when there are delays and waste inventories, it is possible that there will also be additional sorts of waste throughout implementation. By employing the value stream mapping method, this study seeks to both detect and simultaneously minimize or eliminate waste that happens during the construction of affordable homes. Two key tasks are completed: creating an overview of the current state map, which represents the state of the development process currently, and offering solutions and suggestions for improvement given as a future state map.
Keywords
Full Text:
PDFReferences
S. Alwi, K. Hampson, S.C. Mohamed. (2002). “Factors influencing contractor performance in Indonesia: A study of non-value adding activities”, International Conference on Advancement in Design, Construction, Construction Management, and Maintenance of Building Structure, Bali: ADCCMBS, pp. 20-34, 2002.
A. O. Ralph and R. Iyagba. (2012). “Factors Affecting Contractor Performance : A Comparative Study of Non Value-Adding Activities in Nigeria and Indonesia”, vol. 3, no. 5, pp. 467–474.
Abdul-Rahman, Hamzah ., M. Hassen Al-Tmeemy, Samiaah., Harun , Zakaria., , Kho, Mei Ye. (2012). “The Major Causes of Quality Failures in the Malaysian Building Construction Industry, Research & Innovation”, University of Malaya, 50603 Kuala Lumpur, Malaysia.
Aziz, Remon Fayek., Hafez, Sherif Mohamed. (2013). “Applying Lean Thinking in Construction and Performance Improvement”, Structural Engineering Department, Faculty of Engineering, Alexandria University, Egypt.
Aki Pekuri., Harri Haapasalo., Maila Herrala.(2013). “Productivity and Performance Management – Managerial Practices in The Construction Industry”, International Journal of Performance Measurement, 2011, Vol. 1, 39 – 58.
Barathwaj, R., Singh, R.V., G.I, Gunarani. (2017). “Lean Construction: Value Stream Mapping for Residentials Construction”, International Journal of Civil Engineering and Technology (IJCIET), Vol 8, Issue 5, pp 1072 – 1086.
Gresh, John. (2011). “Application of Lean Principles and Practices in Construction Management”, www.iienet2.org.
Haapasalo, H., Ingalsuo, K. and Lenkkeri. T. (2006). “Linking Strategy Into Operational Management – A Survey of BSC Implementation in Finnish Energy Sector”, Benchmarking: An International Journal 13 (6).
Handoko, T. Hani. (2004). “Personnel Management and Human Resources”, Second Edition of The Fourteenth Print, Yogyakarta : BPFE.
Koskela, Lauri., Howell, Greg., Ballard, Glenn and Tommelein, Iris. (2006). “The Foundations of Lean Construction”, Research Gate.
O’Connor, R and Swain, B. (2013). “Implementing Lean in Construction: Lean Tools and Techniques – an Introduction”. C730, CIRIA, London (ISBN:978-0-86017-732-6) . Go to: www.ciria.org/service/lean.
P.O. Akanni, A.E. Oke, O.A. Akpomiemie. (2015). “Impact of Environmental Factors on Building Project Performance in Delta State, Nigeria”, Housing and Building National Research Center, HRBC Journal, http://ees.elsevier.com/hrbcj.
Rother dan Shook, Value Stream Mapping. (2009). http://courses.washington.edu/ie337/Value_Stream_Mapping.pdf.
Suparno, et al. (2006). “Planning and Housing Development”, ANDI Publisher, Yogyakarta.
Simanjuntak, Payaman J. (2005). “Management and Performance Evaluation”,.Jakarta : Institution Publisher Faculty of Economics, University of Indonesia.
S.O. Cheung., H.C.H. Suen., K.K.W. Cheung. (2004). “PPMS: a Web Based Construction Project Performance Monitoring System”. Autom. Construction. 13 (3) (2004 May): 361 – 366.
S.Ng. Thomas., E. Palaneeswaran., M.M. Kumaraswamy. (2002). “ A Dynamic e-Reporting System for Contractor’s Performance Appraisal”, J, Adv. Eng, Software 33 (6) (2002 June) 339 – 349.
Wulan Puspitasari, Chapter 2 (Literature Review). (2008). http://www.digilib.itb.ac.id/files/disk1/608/jbptitbpp-gdl-wulanpuspi-30376-3-2008ts-2.pdf.
Yu, Haitao., Al-Hussein, Mohammed. (2009). “Development of Lean Model for House Construction Using Value Stream Mapping”, Journal of Construction Engineering and Management.
DOI: https://doi.org/10.24853/ijcei.2.2.37-47
Refbacks
- There are currently no refbacks.
International Journal of Civil Engineering and Infrastructure (IJCEI) Indexing By:
Copyright of International Journal of Civil Engineering and Infrastructure (IJCEI) (e-ISSN: 2776-2580).
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License