Analysis of Heavy Equipment Quantity using Quantitative Methods Software (QM) for Windows V5 on Road Infrastructure Works
Main Article Content
Abstract
Downloads
Article Details
COPYRIGHT POLICY
The author(s) of an article published in the Jurnal Teknologi retains ownership of the intellectual property rights in work (s).
PUBLISHING RIGHTS
The author(s) of an article published in the Jurnal Teknologi have unrestricted publication rights. The authors give the Jurnal Teknologi the right to publish the article and designate the Faculty of Engineering Universitas Muhammadiyah Jakarta Publishing as the original publisher of the article.
LICENSING POLICY
Journal of Mechanical Engineering and Sciences is an open-access journal that follows the Creative Commons Non-Commercial 4.0 International License (CC BY-NC 4.0), which states that:
Under this license, the reusers must give appropriate credit, provide a link to the license, and indicate if changes were made. Users may do so in any reasonable manner, but not in any way that suggests the licensor endorses users or their use.
Please take the time to read the whole license agreement (https://creativecommons.org/licenses/by-nc/4.0/). As long as reusers follow the license conditions, the owner cannot withdraw these freedoms. The following components are included under this license:
Attribution: Users must provide appropriate attribution, including a link to the license, and indicate whether or not they made any modifications. Users are free to do so reasonably, but not in a manner that indicates the licensee approves of their usage.
NonCommercial: Users may not use the material for commercial purposes.
References
APAAB United Tractors. (2012). Heavy equipment management.
Bogenberger, C., Dell'Amico, M., Fuellerer, G., Hoefinger, G., Iori, M., Novellani, S., & Panicucci, B. (2015). Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6), 1–11.https://doi.org/10.1061/(ASCE)CO.1943-7862.0000973
Burt, C.N. (2008). An Optimization Approach to Materials Handling in Surface Mines. (August), 23;26.
De Lima, RX, Júnior, EFN, Prata, BDA, & Weissmann, J. (2013). Distribution of materials in earthmoving and paving roads: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), 1046–1054. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000666
Dipohusodo, I. (1995). Project & Construction Management. Yogyakarta: Kanisius Publishing Agency
Fadhliyah, B. (2011). Optimization of Workforce Planning Costs in Casting Work on Building Construction Projects.
Heizer, J., & Render, B. (2019). Linear Programming Module (9th ed.).
Hummer, JE, Arocho, I., & Rasdorf, W. (2017). Approach to Assessing Tradeoffs between Construction Equipment Fleet Emissions and Cost. Journal of Construction Engineering and Management, 143(5), 1–10.https://doi.org/10.1061/(ASCE)CO.1943-7862.0001255
Kang, S., & Seo, J. (2013). GIS Method for haul road layout planning in large earthmoving projects: Framework and analysis. Journal of Construction Engineering and Management, 139(2), 236–246.https://doi.org/10.1061/(ASCE)CO.1943-7862.0000561
Karshenas, S. (1989). Truck Capacity Selection For Earthmoving. 115(2), 212–227.
Decree of the Minister of Energy and Mineral Resources of the Republic of Indonesia. Guidelines for Implementing Good Mining Engineering Principles. , (2018).
Li, D., & Lu, M. (2017). Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach. Journal of Construction Engineering and Management, 143(1), 1–17.https://doi.org/10.1061/(ASCE)CO.1943-7862.0001214
Moselhi, O., & Alshibani, A. (2009). Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), 948–954.https://doi.org/10.1061/(ASCE)0733-9364(2009)135:10(948)
Nassar, K., & Hosny, O. (2012). Solving the least-cost route cut and fill sequencing problem using particle swarms. Journal of Construction Engineering and Management, 138(8), 931–942.https://doi.org/10.1061/(ASCE)CO.1943-7862.0000512
Ozdemir, B., & Kumral, M. (2017). Stochastic Assessment of the Material Haulage Efficiency in the Earthmoving Industry. Journal of Construction Engineering and Management, 143(8), 1–9.https://doi.org/10.1061/(ASCE)CO.1943-7862.0001336
Park, YJ, Gwak, HS, & Lee, DE (2017). Dozer Workability Estimation Method for Economic Dozing. Journal of Construction Engineering and Management, 143(2), 1–14.https://doi.org/10.1061/(ASCE)CO.1943-7862.0001228.
Provincial Government of Central Kalimantan, Department of Energy and Mineral Resources. (2018). Evaluation Report on the Implementation of Quarter IV Activities of 2017 Fiscal Year.
Qariatullailiyah, & Indryani, R. (2013). Optimization of the Cost of Using Heavy Equipment for Transportation and Stockpiling Work on the Grand Island Surabaya Project with a Linear Program. Journal of Engineering Pomits, 2(1), 1–5.
Rostiyanti, SF (2008). HEAVY EQUIPMENT FOR CONSTRUCTION PROJECTS. In Rineka Cipta.
Siringoringo, H. (2005). Linear Programming Operational Research Techniques Series. Yogyakarta: Science Graha.
Suharto, I. (1999). Project Management (From Conceptual to Operational). Jakarta: Erlangga
Subagya, P. (2000). Project Management Analysis Volume 2. Bekasi: Graha Pena.