Herwanto, D., & Sari, R. P. (2018). EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA. Jurnal Teknologi, 10(1), 9–18. https://doi.org/10.24853/jurtek.10.1.9-18