Herwanto, D. and Sari, R. P. (2018) “EVALUASI WAKTU PROSES SUPPLY SMALL PART DENGAN MEMPERHATIKAN BEBAN KERJA DI PT. TOYOTA MOTOR MANUFACTURING INDONESIA”, Jurnal Teknologi, 10(1), pp. 9–18. doi: 10.24853/jurtek.10.1.9-18.