IMPLEMENTASI M-PERT DAN ABC PADA PROYEK PEMBANGKIT LISTRIK
Abstract
Keywords
Full Text:
PDFReferences
Ballesteros-Pérez, Pablo. "M-PERT: Manual Project-Duration Estimation Technique." Journal Construction Engineering and Management, 2017.
H. Saadat, “Power System Analysis,” McGraw-Hill, New York, 1999.
Render, Barry dan Jay Heizer,( 2005). Manajemen Operasi. Jakarta: Salemba Empat.
Kaplan, Robert S & Robin Copper, “Cost and Effect”, Boston : Harvard Business School Press, 1998.
Sudjana, Metode statistika edisi ke-6. Bandung: Tarsito, 2005.
Sugiyono, Memahami penelitian kualitatif. Bandung: Alfabeta, 2012.
Sugiyono, Metode penelitian kuantitatif kualitatif dan R&D. Bandung: Alfabeta, 2009
Renstra Kem.ESDM 2015-2019
Ashadi A. & A.E.Husin. “Metode Penjadwalan M-PERT Sebagai Alternatif Solusi Akurasi Estimasi Waktu Proyek (Review)”, 2019.
A.E.Husin. F.Fahmi, S.Raharjo, Ikhsan & Bernadette D.K. “M-PERT and Lean Construction Integration on Steel Construction Works of warehouse Buildings”, 2019.
DOI: https://doi.org/10.24853/jk.14.1.1-7
Refbacks
Jurnal Konstruksia Indexing By:
Copyright of Jurnal Konstruksia (e-ISSN:2443-308X, p-ISSN:2086-7352).
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License