Faktor Penyebab Klaim yang Menyebabkan Sengketa Pada Proyek Pengerukan dan Reklamasi Berdasarkan FIDIC Form of Contract for Dredging and Reclamation Edition 2016 (Blue Book)
Abstract
Keywords
Full Text:
PDFReferences
B. G. F. J. I and F. T. Hartman, “9 Insufficient time for bid preparation 9 Stop-and-go operations because of lack of coordination , design in- formation , equipment , or material 9 Work in congested areas and overcrowding 9 Acceleration to regain schedule 9 Inadequate investigation befor,” vol. 120, no. 3, pp. 553–560, 1995
C. Yuliana, Japril, and I. Radam, “Alternative Contractual Models of Dredging Projects to Avoid Disputes (A Case Study of the Special Port in Kotabaru),” The International Journal of Engineering and Science, vol. 4, no. 4, pp. 5–10, 2015, doi: 10.6084/M9.FIGSHARE.1409384.V1
D. Kinlan, “Valuing Variations in Dredging Contracts,” pp. 25–30, 1987.
E. Gerald, “ANALISIS KLAUSULA KONTRAK YANG TERKAIT DENGAN KLAIM PADA FIDIC CONDITION OF CONTRACT 1999 institusi internasional seperti World Bank Group , International Bank for Reconstruction and ILO dan lain sebagainya . Kontrak FIDIC yang sering digunakan pada proye,” vol. 5, no. 2, pp. 501–512, 2021.
FIDIC Form of Contract for Dredging and Reclamation Second Edition 2016
G. A. Taurano et al., “ANALISIS FAKTOR PENYEBAB KLAIM PADA PROYEK KONSTRUKSI YANG MENGGUNAKAN FIDIC CONDITIONS OF CONTRACT,” vol. 5, 2013.
Hardjomuljadi, Sarwono. 2015. Buku Kedua: Manajemen Klaim Konstruksi FIDIC Conditions of Contract. Bandung: Logoz Publishing
Iskandar, S. Hardjomuljadi, and H. Sulistio, “The Most Influencing Factors on the Causes of Construction Claims and Disputes in the EPC Contract Model of Infrastructure Projects in Indonesia,” Review of International Geographical Education Online, vol. 11, no. 2, pp. 80–91, 2021, doi: 10.33403/rigeo.800441.
M. P. Jalal, E. Noorzai, and T. Y. Roushan, “Root Cause Analysis of the Most Frequent Claims in the Building Industry through the SCoP 3 E Ishikawa Diagram,” vol. 11, no. 2017, pp. 1–10, 2019, doi: 10.1061/(ASCE)LA.1943-4170.0000289.
Perpres No 16, “Perpres Nomor 16 Tahun 2018,” Pemerintah Republik Indonesia, no. 1, pp. 1–5, 2018, [Online]. Available: https://jdih.lkpp.go.id/regulation/1001/peraturan-presiden-nomor-16-tahun-2018.
Sugiyono, S. (2017). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta, CV
S. A. Fawzy, I. H. El-adaway, L. Perreau-Saussine, M. S. Abdel Wahab, and T. H. Hamed, “Claims for Extension of Time and Additional Payment under Common Law FIDIC: Civil Law Analysis,” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 10, no. 4, p. 06518002, 2018, doi: 10.1061/(asce)la.1943-4170.0000276.
S. Hardjomuljadi, “Factor analysis on causal of construction claims and disputes in Indonesia (with reference to the construction of hydroelectric power project in Indonesia),” International Journal of Applied Engineering Research, vol. 9, no. 22, pp. 12421–12446, 2014
T. Maddock and M. Vandenberghe, “a Review of the Fidic Blue Book ( Second Edition ),” pp. 15–22, 2006.
W. Shen, W. Tang, W. Yu, and C. F. Duffield, “CAUSES OF CONTRACTORS ’ CLAIMS IN INTERNATIONAL ENGINEERING-PROCUREMENT-CONSTRUCTION PROJECTS,” vol. 23, no. 6, pp. 727–739, 2017.
DOI: https://doi.org/10.24853/jk.15.1.15-26
Refbacks
- There are currently no refbacks.
Jurnal Konstruksia Indexing By:
Copyright of Jurnal Konstruksia (e-ISSN:2443-308X, p-ISSN:2086-7352).
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License