SISTEM PENGAMBILAN KEPUTUSAN METODE KONSTRUKSI BERBASIS ANALYTICAL HIERARCHY PROCESS
Abstract
Keywords
Full Text:
PDFReferences
J. W. Soetjipto, “Analisa Perbandingan Pelaksanaan Pembangunan Menggunakan Beton Konvensional dengan Elemen Beton Pracetak pada Bangunan Tingkat Tinggi,” Diagonal, vol. 5, no. October, pp. 1–15, 2014.
F. Prawidiawati, Analisa Perbandingan Metode Bottom-Up dan Metode Top-Down Pekerjaan Basement Pada Gedung Parkir Apartemen Skyland City Education Park Bandung Dari Segi Biaya Dan Waktu, 1st ed. Surabaya: ITS Surabaya, 2015.
C. B. Prawidiawati, F.; Nurcahyo, “Analisa Perbandingan Metode Bottom-Up dan Metode Top-Down Pekerjaan Basement pada Gedung Parkir Apartemen Skyland City Education Biaya Waktu,” J. Tek. Its, vol. 4, no. 1, pp. 1–5, 2015.
M. Tanubrata, “Pelaksanaan Konstruksi Dengan Sistem Top-Down,” in Simposium Nasional RAPI XIV, 2015, pp. 289–293.
P. N. Alifani, R. M. Kurnia, and A. B. Broto, “Tinjauan Metode Konstruksi Top-Down Dan Bottom-Up Berdasarkan Biaya Dan Waktu,” in Seminar Nasional Teknik Sipil Politeknik Negeri Jakarta, 2019, pp. 551–560.
J. E. Leal, “AHP-express: A simplified version of the analytical hierarchy process method,” MethodsX, vol. 7, 2020, doi: 10.1016/j.mex.2019.11.021.
R. Harianto, T. Sipil, U. Mercubuana, B. Susetyo, T. Sipil, and U. Mercubuana, “Pemilihan Kontraktor Spesialis oleh Kontraktor Utama dengan Metode Analytical Hierarchy Proces,” J. Konstr., vol. 12, no. 1, pp. 45–52, 2020.
X. Deng, Y. Hu, Y. Deng, and S. Mahadevan, “Supplier selection using AHP methodology extended by D numbers,” Expert Syst. Appl., vol. 41, no. 1, pp. 156–167, 2014, doi: 10.1016/j.eswa.2013.07.018.
P. Parthiban, H. . Zubar, and C. . Garge, “A Multi Criteria Decision Making Approach for Suppliers Selection,” Procedia Eng., vol. 38, no. 2012, pp. 2312–2328, 2012.
B. Anjasmoro, S. Suharyanto, and S. Sangkawati, “Analisis Prioritas Pembangunan Embung Metode Cluster Analysis, AHP dan Weighted Average (Studi Kasus: Embung di Kabupaten Semarang),” Media Komun. Tek. Sipil, vol. 21, no. 2, p. 101, 2016, doi: 10.14710/mkts.v21i2.11236.
M. Kassab, T. Hegazy, and K. Hipel, “Computerized DSS for Construction Conflict Resolution under Uncertainty,” J. Constr. Eng. Manag., vol. 136, no. 12, pp. 1249–1257, 2010, doi: 10.1061/(asce)co.1943-7862.0000239.
R. Mohemad, A. R. Hamdan, Z. A. Othman, and N. M. M. Noor, “Decision Support Systems (DSS) in Construction Tendering Processes,” Int. J. Comput. Sci. Issues, vol. 7, no. 2, pp. 35–45, 2010, [Online]. Available: http://arxiv.org/abs/1004.3260.
I. Herman Firdaus, G. Abdillah, F. Renaldi, and U. Jenderal Achmad Yani Jl, “Sistem Pendukung Keputusan Penentuan Karyawan Terbaik Menggunakan Metode Ahp Dan Topsis,” in Seminar Nasional Teknologi Informasi dan Komunikasi, 2016, vol. 2016, no. Sentika, pp. 2089–9815.
Narti, “Sistem Pendukung Keputusan Pemilihan Siswa Berprestasi Menggunakan Metode AHP Dan Topsis,” J. Inform., vol. 4, no. 2, pp. 196–205, 2017.
DOI: https://doi.org/10.24853/jk.12.2.1-13
Refbacks
- There are currently no refbacks.
Jurnal Konstruksia Indexing By:
Copyright of Jurnal Konstruksia (e-ISSN:2443-308X, p-ISSN:2086-7352).
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License