Klausula Kontrak yang Terkait dengan Extension of Time FIDIC Condition of Contract 2017
Abstract
Keywords
Full Text:
PDFReferences
Fitch Solution (2021) Indonesia Country Risk Report. Fitch Solution New York, United States.
Researchandmarkets.Com (2022) “Global Marketplaces Report”, Researchandmarkets.Com. Dublin. Ireland.
Sugiyono (2015) “Metode Penelitian Manajemen”. CV. Alfabeta. Bandung
FIDIC (2017) “Construction Contract 2nd Ed (Red Book 2017)”, FIDIC, Geneva
Society of Construction Law (2017). “Delay and Disruption Protocol, 2nd Edition” scl.org.uk. UK
FIDIC (2021) “Short Form of Contract 2nd Ed (Green Book 2021)”. FIDIC, Geneva
Hardjomuljadi, S. (2014) “Analisis “Extension of Time” Dan Dampaknya Pada Kontrak Konstruksi (Fidic Conditions of Contract MDB Harmonised Edition)”. Jurnal Konstruksia.
El-Adaway, I and Fawzy, S. and Ahmed, M. and White, R. (2016) “Administering Extension of Time Under National and International Standard Forms of Contracts: A Contractor’s Perspective”. Journal of Legal Affairs and Dispute Resolution In Engineering and Construction.
Rohitha, M. and Krishnamoorthy, S (2021).”A Study on The Extension of Time (EOT) Claims and Protocols”, International Research Journal of Engineering and Technology (IRJET)
Yusuwan NM, and Adnan H, (2013) “Issues Associated With Extension of Time (EOT) Claim In Malaysian Construction Industry”. Procedia Technology, Volume 9, 2013, 740-749.
El-Adaway, I and Vance, RA and ; Abotaleb IS, (2019) “Understanding Extension of Time Under Different Standard Design-Build Forms of Contract” ASCE, Virginia.
DOI: https://doi.org/10.24853/jk.14.2.141-148
Refbacks
- There are currently no refbacks.
Jurnal Konstruksia Indexing By:
Copyright of Jurnal Konstruksia (e-ISSN:2443-308X, p-ISSN:2086-7352).
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License