PEMILIHAN KONTRAKTOR SPESIALIS OLEH KONTRAKTOR UTAMA DENGAN METODE ANALYTICAL HIERARCHY PROCESS
Abstract
Keywords
Full Text:
PDFReferences
Alarco, L. F, Mourgues, C. Performance Modeling for Contractor Selection. Asce Journal of Management in Engineering. 2002 18 (2) 52-60.
Alessio Ishizaka, Ashraf Labib. Selection of new production facilities with the group Analytic Hierarchy Process Ordering method. Expert Systems with Applications 2011 38 7317-7325.
Crowley, L, G, Hancher, D. E. Evaluation of Competitive Bids. ACSE Journal of Construction Engineering and Management. 2009 121 (2) 238-245.
El-Sawalhi, N., Eaton, D., Rustom, R. Contractor Pre-Qualification Model. International Journal of Project Management. 2007 25 (5) 456-474.
Fong, P. S. W., Choi, S. K. Y. Final Contractor Selection Using The Analytical Hierarchy Process. Contruction Management and Economics 2000 18 (5) 547-557.
Palaneeswaran, E., Kumaraswamy, M. M. Contractor Selection for Design/Build Project. ASCE Journal of Construction Engineering and Management, 2010 126 (5) 331-339.
Sukarmei, Dwi (2011). Pengaruh Metode Evaluasi Penawran Pengadaan Barang/Jasa Pemerintah Terhadap Hasil Pekerjaan Dengan Pendekatan Analytical Hierarchy Process (Studi Kasus di Pemerintahan Kabupaten Temanggung). Tesis Magister Teknik Sipil Program Pasca Sarjana Universitas Diponegoro, Semarang.
Suliantoro, Hery. 2008. Penerapan Metode Analytic Hierarchy Process (AHP) untuk Metode Evaluasi Penawaran dengan Sistem Nilai. Tesis Abstract. Teknik Industri. UNDIP. Semarang.
Thomas L. Saaty, (1994). Analytical Hierarchy Process. Bandung .Alfabeta.
DOI: https://doi.org/10.24853/jk.12.1.45-52
Refbacks
- There are currently no refbacks.
Jurnal Konstruksia Indexing By:
Copyright of Jurnal Konstruksia (e-ISSN:2443-308X, p-ISSN:2086-7352).
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License