ANALISA PERBANDINGAN BIAYA PENGGUNAAN NUTRUNNER MANUAL DAN OTOMATIS MENGGUNAKAN METODE COST & BENEFITS ANALYSIS
DOI:
https://doi.org/10.24853/jisi.4.1.65-72Keywords:
Manufacturing, reject, Nutrunner, assembly, Desoutter Rightway, Manual, Automatic, Cost & Benefits Analysis, Payback Period Method, Return On Investment.Abstract
In a situation of increasingly fierce competition in every manufacturing company, PT SZI supposedly able to apply concepts and production strategies well as improve product quality. Thus the need for the selection of the right nutrunner as an investment in the assembly process. The assembly process is the part that greatly affects the quantity and quality of production in the manufacturing industry, the faster the process of assembling the more units are produced. Likewise with the production quality, the better the nutrunner is used it will be less risk of rejection unit which will incur additional costs.Nutrunner is a tool used for tightening bolts / nuts that are powered by wind energy or electricity. The different types of energy use in nutrunner that is the term naming nutrunner automatic and manual will be compared based on several aspects that will be selected which are more efficient in the production process. In search results of the comparison, cost calculation will use the application Desoutter Rightway. After known perbandinagn some aspects costs (energy costs, productivity costs, calibraton cost, maintenance cost, and quality cost) then the analysis will be continued use Cost & Benefits Analysis to get some of the goals of this research, which is a long period of return on investment or breakeven on the project this nutrunner with Payback Period method. Besides the cost analysis is also used to find the value of benefits in order to determine whether the project is feasible and acceptable methods Return on Investment.After the data were analyzed using the method of cost and benefit analysis then obtained a long period of payback or breakeven for automatic nutrunner investment is 1.22 years and 14.63 months. As for the value of the benefits of 146%, this means that the project is acceptable because it provides the advantages of the total investment cost.Downloads
Published
Issue
Section
License
COPYRIGHT POLICY
The author(s) of an article published in the JISI UMJ retains ownership of the intellectual property rights in work (s).
PUBLISHING RIGHTS
The author(s) of an article published in the JISI UMJ have unrestricted publication rights. The authors give the JISI UMJ the right to publish the article and designate the Industrial of Engineering Universitas Muhammadiyah Jakarta Publishing as the original publisher of the article.
LICENSING POLICY
Journal of Industrial Engineering and Sciences is an open-access journal that follows the Creative Commons Non-Commercial 4.0 International License (CC BY-NC 4.0), which states that:
Under this license, the reusers must give appropriate credit, provide a link to the license, and indicate if changes were made. Users may do so in any reasonable manner, but not in any way that suggests the licensor endorses users or their use.
Please take the time to read the whole license agreement (https://creativecommons.org/licenses/by-nc/4.0/). As long as reusers follow the license conditions, the owner cannot withdraw these freedoms. The following components are included under this license:
Attribution: Users must provide appropriate attribution, including a link to the license, and indicate whether or not they made any modifications. Users are free to do so reasonably, but not in a manner that indicates the licensee approves of their usage.
NonCommercial: Users may not use the material for commercial purposes.