Table of Contents
Articles
PERANCANGAN PENGERING KERUPUK RAMBAK DENGAN MENGGUNAKAN KOMBINASI ENERGI SURYA DAN ENERGI BIOMASSA KAYU BAKAR
DOI : 10.24853/jisi.4.1.1-10
Okka Adiyanto, Bandul Suratmo, Devi Yuni Susanti
|
1-10
|
PENGEMBANGAN MODEL IDENTICAL DERLIVERY QUANTITY (IDQ) DALAM MANAJEMEN INVENTORI DENGAN PEMBAYARAN TERTUNDA BERBASIS SUKU BUNGA BANK
DOI : 10.24853/jisi.4.1.11-16
Muhammad Faishal, Chaerul Saleh
|
11-16
|
PERENCANAAN PERSEDIAAN BAHAN BAKU PRODUKSI CHEMICAL WATER TREATMENT BOILER DI PT. XYZ
DOI : 10.24853/jisi.4.1.17-26
Sambas Sundana, Zakaria Abdillah Fadhli
|
17-26
|
PENERAPAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA MESIN RIPPLE MILL
DOI : 10.24853/jisi.4.1.27-34
Denur Denur, Legisnal Hakim, Indra Hasan, Syahrul Rahmad
|
27-34
|
ANALISIS STUDI KELAYAKAN USAHA BISNIS CASSAVA CHIPS DI PERUMAHAN MARDANI RAYA
DOI : 10.24853/jisi.4.1.35-44
Utami Gunawati, Wiwik Sudarwati
|
35-44
|
ANALISIS KUALITAS PENGELOLAAN GEDUNG TERHADAP KEPUASAN PELANGGAN MENGGUNAKAN METODE SERVQUAL DAN MODEL KANO (STUDI KASUS : PT.TLP DI GEDUNG TCC)
DOI : 10.24853/jisi.4.1.45-52
Razul harfi, Dwina Suciati Nurrohmah
|
45-52
|
PENERAPAN PROJECT CONTROL PROCESS DENGAN METODE EARNED VALUE MANAJEMEN PADA PROYEK PENGADAAN KELAMBU BERINSEKTISIDA (Studi Kasus PT. Adiwara Worldwide)
DOI : 10.24853/jisi.4.1.53-64
Umi Marfuah, Muhammad Zaki Hiadayat
|
53-64
|
ANALISA PERBANDINGAN BIAYA PENGGUNAAN NUTRUNNER MANUAL DAN OTOMATIS MENGGUNAKAN METODE COST & BENEFITS ANALYSIS
DOI : 10.24853/jisi.4.1.65-72
Ucok Mulyo Sugeng, Tahi Manurung
|
65-72
|