Table of Contents
Articles
PENGGUNAAN SERBUK ARANG TEMPURUNG KELAPA DITINJAU TERHADAP NILAI PERMEABILITAS TANAH SEBAGAI INTI BENDUNG (STUDI KASUS BENDUNGAN GONDANG KARANGANYAR, JAWA TENGAH)
DOI : 10.24853/jk.10.1.1-8
Gita Puspa Artiani, Indah Handayasari
|
1-8
|
EVALUASI KEPUASAN PELANGGAN TERHADAP KINERJA MANAJEMEN PROYEK KONTRAKTOR BESAR (STUDI KASUS : PROYEK PEMBANGUNAN BENDUNGAN KARIAN DI KABUPATEN LEBAK, BANTEN)
DOI : 10.24853/jk.10.1.9-22
Andi Madeppungeng, Dwi Esti Intari, Nuzulan Nur Fauziah
|
9-22
|
FAKTOR-FAKTOR YANG MEMPENGARUHI AUDIT TEKNIK DAN FINANSIAL PADA PROYEK KONSTRUKSI
DOI : 10.24853/jk.10.1.23-38
Deka Yudhit Maristyo P., Sarwono Hardjomuljadi
|
23-38
|
PEMANFAATAN LIMBAH ABU SISA PEMBAKARAN SAMPAH NON ORGANIK SEBAGAI MATERIAL PENGGANTI PASIR PADA BATA BETON PEJAL
DOI : 10.24853/jk.10.1.39-50
Desi Putri, Rr. Mekar Ageng Kinasti, Endah Lestari
|
39-50
|
ANALISIS PRODUKTIVITAS PEKERJAN DENGAN MENGGUNAKAN PEMODELAN WEBCYCLONE PADA PEKERJAAN PEMASANGAN BALOK SEPARATOR LIFT
DOI : 10.24853/jk.10.1.51-58
Azaria Andreas, Vikha Nindya Putri Aztari, Akhmad Dofir
|
51-58
|
ANALISIS FAKTOR PENYEBAB KETERLAMBATAN PEMBAYARAN KONTRAKTOR KEPADA SUBKONTRAKTOR PADA PROYEK GEDUNG BERTINGKAT
DOI : 10.24853/jk.10.1.59-72
Nurul Listanto, Sarwono Hardjomuljadi
|
59-72
|
ANALISIS PENGARUH DEWAN SENGKETA & ARBITRASE TERHADAP PENYELESAIAN SENGKETA KONSTRUKSI BERDASARKAN FIDIC CONDITION OF CONTRACT 2017
DOI : 10.24853/jk.10.1.73-86
Hadi Ismanto, Sarwono Hardjomuljadi
|
73-86
|
ANALISIS DAMPAK BANGUNAN KONSEP SPLIT LEVEL MENGGUNAKAN GEMPA STATIK DAN RESPONS SPEKTRUM
DOI : 10.24853/jk.10.1.87-94
Nisa Nur Albaniah, Haryo Koco Buwono
|
87-94
|
ANALISIS FAKTOR KETERLAMBATAN DIMULAINYA PELAKSANAAN PROYEK KONSTRUKSI PADA MODEL KONTRAK RANCANG BANGUN
DOI : 10.24853/jk.10.1.95-116
Ahmad Migdad Alaydrus, Sarwono Hardjomuljadi
|
95-116
|
PENINGKATAN NILAI KUAT TARIK BELAH BETON DENGAN CAMPURAN LIMBAH BOTOL PLASTIK POLYETYLENE TEREPHTHALATE (PET)
DOI : 10.24853/jk.10.1.117-126
Rocky Armidion, Tanjung Rahayu
|
117-126
|