Articles
OPTIMALISASI TEKNOLOGI ENERGI SURYA BERBASIS PENYESUAIAN POSISI PANEL BULANAN DI SULAWESI TENGGARA
1-8
DOI : https://doi.org/10.24853/jurtek.8.1.1-8Abstract views: 1309 / Download: 157
PENGARUH QUALITY OF WORK LIFE TERHADAP KEPUASAN KERJA KARYAWAN DI PT. GEMALA KEMPA DAYA
9-16
DOI : https://doi.org/10.24853/jurtek.8.1.9-16Abstract views: 1832 / Download: 258
OPTIMASI DESAIN RANGKA SEPEDA BERBAHAN BAKU KOMPOSIT BERBASIS METODE ANOVA
17-22
DOI : https://doi.org/10.24853/jurtek.8.1.17-22Abstract views: 4126 / Download: 152
PENGGUNAAN METODE JALUR KRITIS PADA MANAJEMEN PROYEK (STUDI KASUS: PT. TREND COMMUNICATIONS INTERNATIONAL)
23-30
DOI : https://doi.org/10.24853/jurtek.8.1.23-30Abstract views: 6397 / Download: 624
PENGARUH PH TANAH TERHADAP PROSES BIODEGRADASI POLYCYCLIC AROMATIC HYDROCARBON (PAH) PADA TANAH TERKONTAMINASI BATUBARA
31-38
DOI : https://doi.org/10.24853/jurtek.8.1.31-38Abstract views: 3690 / Download: 182
MENINGKATKAN KAPASITAS LOADING MESIN PRESS 1000T PADA PROSES PRESS BRACKET SUPPORT AIR TANK DENGAN METODE PDCA DI PT. XYZ
39-44
DOI : https://doi.org/10.24853/jurtek.8.1.39-44Abstract views: 1310 / Download: 72
USULAN WAKTU PENGGANTIAN OPTIMUM KOMPONEN MESIN GAS ENGINE (PRECHAMBER GAS VALVE) DENGAN MODEL AGE-BASED REPLACEMENT DI PT. XYZ
45-52
DOI : https://doi.org/10.24853/jurtek.8.1.45-52Abstract views: 1257 / Download: 99