Table of Contents
Articles
OPTIMALISASI RUANG TERBUKA HIJAU BERUPA TAMAN ENERGI BARU TERBARUKAN SEBAGAI UPAYA PEMANFAATAN LAHAN KOSONG DI LINGKUNGAN KAMPUS (STUDI KASUS KAMPUS STT-PLN, JAKARTA)
DOI : 10.24853/jk.11.1.1-10
Gita Puspa Artiani, Sriyono D. Siswoyo
|
1-10
|
Kenny Kapuasiana, Sarwono Hardjomuljadi
|
11-32
|
OPTIMALISASI KINERJA SIMPANG APILL PURI KEMBANGAN BERDASARKAN PEDOMAN KAPASITAS JALAN INDONESIA 2014
DOI : 10.24853/jk.11.1.33-40
Indah Handayasari, Abdul Rokhman, Shevina Halusman
|
33-40
|
ANALISIS KOHESI DAN SUDUT GESEK ANTARA TANAH GAMBUT-GEOTEKSTIL (STUDI TANAH GAMBUT DI KABUPATEN BANJAR)
DOI : 10.24853/jk.11.1.41-50
Muhammad Fitriansyah, Dyah Pradhitya Hardiani, Ichwan Setiawan
|
41-50
|
PERENCANAAN KEMBALI TEBAL PERKERASAN JALAN BETON BERTULANG MENERUS DENGAN METODE AASHTO 1993 DAN EVALUASI CRACK (STUDI KASUS RUAS JALAN TOL BALARAJA KM. 34+500 – 36+300)
DOI : 10.24853/jk.11.1.51-62
Muhammad Fakhruriza Pradana, Rindu Twidi Bethary, Siti Hadiyati Rohmah
|
51-62
|
PERENCANAAN PENAHAN TANAH 15 M DENGAN DINDING KANTILEVER DI PERIMETER SWICHYARD SKYLAND JAYAPURA
DOI : 10.24853/jk.11.1.63-72
Moch. Aswanto
|
63-72
|
PENGGANTIAN SLING PADA MENARA TELEKOMUNIKASI RANGKA BAJA YANG DISUPPORT OLEH GUY WIRE
DOI : 10.24853/jk.11.1.73-78
Budi Satiawan
|
73-78
|
PERBANDINGAN PELELANGAN BERBASIS SISTEM MANUAL DENGAN SISTEM LAYANAN PENGADAAN SECARA ELEKTRONIK (LPSE)
DOI : 10.24853/jk.11.1.79-88
Vita Mayasari
|
79-88
|
STUDI FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI STUDI KASUS PROYEK PEMBANGUNAN 6 RUAS JALAN TOL DALAM KOTA JAKARTA
DOI : 10.24853/jk.11.1.89-96
Andi Maddeppungeng, Dwi Esti Intari, Aulia Oktafiani
|
89-96
|