|
Issue |
Title |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
ANALISIS PENERAPAN PROGRAM K3/5R DI PT X DENGAN PENDEKATAN STANDAR OHSAS 18001 DAN KEMUNGKINAN PENERAPAN PADA PENGERJAAN PROYEK KONSTRUKSI SELAMA VIRUS CORONA MEWABAH |
Abstract
PDF
|
Prihadi Waluyo |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
PEMILIHAN KONTRAKTOR SPESIALIS OLEH KONTRAKTOR UTAMA DENGAN METODE ANALYTICAL HIERARCHY PROCESS |
Abstract
PDF
|
Rudi Harianto, Budi Susetyo |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
METODE BOWTIE UNTUK DAMPAK KECELAKAAN KERJA PADA PROYEK JALAN (STUDI KASUS PROYEK PEMBANGUNAN JALAN TOL SERPONG – BALARAJA SEKSI I A) |
Abstract
PDF
|
Andi Maddeppungeng, Siti Asyiah, Muhammad Iqbal |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
NILAI PRODUKTIVITAS PREFABRICATED VERTICAL DRAIN MENGGUNAKAN METODE TIME STUDY |
Abstract
PDF
|
Eka Nur Fitriani, Suprapti Suprapti |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
PERILAKU TANAH LEMPUNG BERPASIR DI BANJARMASIN AKIBAT GAYA INTERFACE PADA GEOTEXTILE |
Abstract
PDF
|
Muhammad Fitriansyah, Ichwan Setiawan |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
BACK ANALYSIS PARAMETER KONSOLIDASI PADA PEMBEBANAN VAKUM DENGAN PVD |
Abstract
PDF
|
Ronald Yohanson, Tommy Ilyas |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
PEMANFAATAN LIMBAH KAYU GALAM BARITO KUALA SEBAGAI PENGGANTI AGREGAT KASAR PADA CAMPURAN BETON |
Abstract
PDF
|
Elia Anggarini, Irwandy Muzaidi |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
STABILITAS DAN DEFORMASI LERENG VILLA SEKEQ GRUPUK DENGAN SIMULASI NUMERIS |
Abstract
PDF
|
Sukandi Sukandi, Ni Putu Ety Lismaya Dewi |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
ALTERNATIF STABILITAS TIMBUNAN DENGAN BATASAN KORELASI PARAMETER TANAH SEPANJANG TOL SERANG-PANIMBANG MENGGUNAKAN SLOPE-W |
Abstract
PDF
|
Azzah Balqis Sabbah, Retno Mayasari, Isna Pratiwi |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
PREDIKSI DEFLEKSI BALOK KAYU TUMPUAN SEDERHANA DENGAN MODEL ADAPTIVE NEURO FUZZY INFERENCE SYSTEM (ANFIS) |
Abstract
PDF
|
Novia Hilda Silviani, Buan Anshari, Ngudiyono Ngudiyono |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
DESAIN ULANG STRUKTUR DROP PANEL JOGJA APARTEMEN DIGANTIKAN DENGAN STRUKTUR BALOK MENGGUNAKAN SNI 2847:2013 DAN SNI 1726:2012 |
Abstract
PDF
|
Yoga Aprianto Harsoyo, Irwan Setyo Wibowo |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
PEMILIHAN METODE PERBAIKAN DAN PERKUATAN STRUKTUR AKIBAT GEMPA (STUDI KASUS PADA BANK SULTENG PALU) |
Abstract
PDF
|
Heri Khoeri |
|
Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 |
ANALISIS DITERIMANYA KLAIM PERPANJANGAN WAKTU DAN TAMBAHAN BIAYA PADA PROYEK BANGUNAN AIR DI PROVINSI BANTEN |
Abstract
PDF
|
Asep Rachmatullah, Sarwono Hardjomuljadi |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
EVALUASI PENURUNAN PONDASI TANGKI MINYAK SESUAI API 653 |
Abstract
PDF
|
Budi Satiawan, Tanjung Rahayu Raswitaningrum |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
PEMODELAN PERILAKU KERUNTUHAN BALOK TINGGI AKIBAT PENURUNAN PONDASI DI ATAS TANAH LUNAK KOTA BANJARMASIN MENGGUNAKAN METODE ELEMEN HINGGA 3D |
Abstract
PDF
|
Elia Anggarini, Irwandy Muzaidi |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
PEMILIHAN FIXED HEAD ATAU FREE HEAD DALAM DESAIN FUNDASI TANGKI REAKTOR KAP. 2000 M3 PILOT PLANT BIOGAS POME SETARA 700 KW DI PTPN V RIAU |
Abstract
PDF
|
Samdi Yarsono, Lan Marrakup TN, Ika Wulandari, Eva Nur Septinia, Giman Giman, Mohammad Imamuddin, Juda Suwandi, Basit Al Hanif |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
ANALISIS KINERJA U-TURN (STUDI KASUS U-TURN DI ITC JALAN LETJEN SOEPONO, JAKARTA) |
Abstract
PDF
|
Harwidyo Eko Prasetyo, Tri Santoso |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
ANALISIS PEMILIHAN MODEL KONTRAK KONSTRUKSI PEKERJAAN PEMBANGUNAN PEMBANGKIT LISTRIK (FIDIC RAINBOW CONTRACT 2017) |
Abstract
PDF
|
Sevren Buana Putra, Sarwono Hardjomuljadi |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
ANALISIS BIAYA OPERASI KENDARAAN (BOK) SEPEDA MOTOR ELEKTRIK DAN PERAHU MOTOR DALAM PERKEMBANGAN EKONOMI PEMBANGUNAN DI KABUPATEN ASMAT |
Abstract
PDF
|
Wiryawan Purboyo |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
EVALUASI KEPUASAN PELANGGAN TERHADAP KINERJA MANAJEMEN PROYEK KONTRAKTOR BESAR (STUDI KASUS : PROYEK PEMBANGUNAN BENDUNGAN KLM DI PROVINSI BANTEN) |
Abstract
PDF
|
Andi Madeppungeng, Dwi Esti Intari, Nuzulan Nur Fauziah |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
STUDI PARTICULAR CONDITION PADA PROYEK - PROYEK MILIK SWASTA |
Abstract
PDF
|
Hari Anggeriksari, Sarwono Hardjomuljadi |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
ANALISIS PERBANDINGAN MODEL KONTRAK APBN DAN APBD TERHADAP MODEL KONTRAK FIDIC |
Abstract
PDF
|
Ediyanto Arief, Sarwono Hardjomuljadi |
|
Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 |
ANALISIS RED CLAUSE KONTRAK KONSTRUKSI APBD DENGAN FIDIC RED BOOK 1999 |
Abstract
PDF
|
Randy Angga Erland Kesek, Sarwono Hardjomuljadi |
|
Vol 11, No 1 (2019): Jurnal Konstruksia Vol 11 No. 1 Tahun 2019 |
OPTIMALISASI RUANG TERBUKA HIJAU BERUPA TAMAN ENERGI BARU TERBARUKAN SEBAGAI UPAYA PEMANFAATAN LAHAN KOSONG DI LINGKUNGAN KAMPUS (STUDI KASUS KAMPUS STT-PLN, JAKARTA) |
Abstract
PDF (Bahasa Indonesia)
|
Gita Puspa Artiani, Sriyono D. Siswoyo |
|
Vol 11, No 1 (2019): Jurnal Konstruksia Vol 11 No. 1 Tahun 2019 |
ANALISIS FAKTOR PENYEBAB KLAIM PADA FIDIC DESIGN BUILD 2017 |
Abstract
PDF (Bahasa Indonesia)
|
Kenny Kapuasiana, Sarwono Hardjomuljadi |
|
126 - 150 of 303 Items |
<< < 1 2 3 4 5 6 7 8 9 10 > >>
|