Table of Contents
Articles
FAKTOR DAMPAK KETERLAMBATAN PEMBAYARAN KONTRAKTOR KEPADA SUBKONTRAKTOR PADA PROYEK JALAN TOL
DOI : 10.24853/jk.13.1.1-16
Anggi Raditya, Sarwono Hardjomuljadi, Mawardi Amin
|
1-16
|
FAKTOR-FAKTOR PENYEBAB TERJADINYA SENGKETA KONSTRUKSI PADA PROYEK EPC BROWNFIELD
DOI : 10.24853/jk.13.1.17-28
Helmi Umar Ambadar, Sarwono Hardjomuljadi, Mawardi Amin
|
17-28
|
METODE BUILDING INFORMATION MODELING 5D UNTUK MEMINIMALKAN KLAIM KONSTRUKSI YANG DITIMBULKAN OLEH PENYEDIA JASA
DOI : 10.24853/jk.13.1.29-42
Shanti Astri Noviani, Mawardi Amin, Sarwono Hardjomuljadi
|
29-42
|
KAJIAN KUAT GESER TANAH GAMBUT AKIBAT PRELOADING PADA SKALA KECIL LABORATORIUM
DOI : 10.24853/jk.13.1.43-53
Aazokhi Waruwu, Debby Endriani, Cindy Meutia Dewi, Rika Deni Sisanti
|
43-53
|
ANALISIS PENURUNAN TANAH MENGGUNAKAN METODE VACUUM CONSOLIDATION DENGAN VARIASI JARAK PEMASANGAN PVD
DOI : 10.24853/jk.13.1.54-68
Annur Dhuha Ahsan, Gusneli Yanti, Shanti Wahyuni Megasari
|
54-68
|
PERPINDAHAN MODA TRANSPORTASI DARI KENDARAAN PRIBADI KE SEPEDA DITINJAU DARI SELF-ESTEEM (STUDI KASUS KOTA BANJARMASIN)
DOI : 10.24853/jk.13.1.69-79
Emma Ruhaidani, Dyta Setiawati, Dyah Pradhitya Hardiani
|
69-79
|
SISTEM MONITORING PERAIRAN UNTUK SANITASI KUALITAS AIR LAYAK PAKAI MENGGUNAKAN WIRELESS SENSOR NETWORKS
DOI : 10.24853/jk.13.1.80-87
Irwandy Muzaidi, Rudy Ansari, Elia Anggarini
|
80-87
|
PERENCANAAN DESAIN PINTU AIR OTOMATIS SEBAGAI UPAYA MITIGASI GENANGAN AKIBAT PASANG AIR SUNGAI (JL. BELITUNG KOTA BANJARMASIN)
DOI : 10.24853/jk.13.1.88-96
Muhammad Fitriansyah, Ichwan Setiawan, Muhammad Yusuf Ridhani
|
88-96
|
ONE-SIDED CONTRACT DAN PENGARUHNYA DALAM HUBUNGAN KERJA DI DUNIA KONSTRUKSI
DOI : 10.24853/jk.13.1.97-112
Niniek Lannyati, Sarwono Hardjomuljadi, Mawardi Amin
|
97-112
|
BEBAN MAKSIMUM, TEGANGAN, LENDUTAN DAN MOMEN CURVATUR PADA VARIASI JEMBATAN BETON BALOK T DENGAN MENGGUNAKAN SOFTWARE RESPONSE 2000
DOI : 10.24853/jk.13.1.113-127
Yoga A. Harsoyo, Ahmad Hilmi Saifunuha, Mochamad Agung Wibowo, Jati Utomo Dwi Hatmoko
|
113-127
|
PROYEKSI KINERJA TUNDAAN PADA BUNDARAN MONUMEN SELAMAT DATANG, JAKARTA
DOI : 10.24853/jk.13.1.128-136
Andika Setiawan
|
128-136
|
Mega Isnaeni, Nur Aziza Putri, Nunung Martina, Muhammad Fathur Rouf Hasan
|
137-151
|
Budi Satiawan
|
152-163
|
PERENCANAAN MANAJEMEN PROYEK DENGAN METODE CPM (CRITICAL PATH METHOD) DAN PERT (PROGRAM EVALUATION AND REVIEW TECHNIQUE)
DOI : 10.24853/jk.13.1.164-180
Naura Mutia Astari, Ade Momon Subagyo, Kusnadi Kusnadi
|
164-180
|
RESPONS KETIDAKBERATURAN STRUKTUR TORSI DAN TORSI BERLEBIH GEDUNG 16 LANTAI MENGGUNAKAN METODE LINEAR TIME HISTORY ANALYSIS
DOI : 10.24853/jk.13.1.181-191
Imam Taufik, Seplika Yadi, Pinta Astuti
|
181-191
|