Full Issue
View or download the full issue |
Table of Contents
Articles
Rangga Rahmadya, Humiras Hardi Purba, Budi Susetyo
|
1-7
|
PENENTUAN PEKERJAAN PRESERVASI JALAN NASIONAL PEMATANG REBA-RENGAT BERDASARKAN UMUR SISA PERKERASAN
DOI : 10.24853/jk.14.1.8-17
Benny Hamdi Rhoma Putra, M. Rilly Aka Yogi, Elianora Elianora, Rizqy Ridho Prakasa
|
8-17
|
DAMPAK PENDEMI COVID-19 ATAS TIMBULNYA KLAIM WAKTU DAN BIAYA PADA PROYEK-PROYEK PEMBANGKIT LISTRIK DI INDONESIA
DOI : 10.24853/jk.14.1.18-32
Rudy Nugroho, Sarwono Hardjomuljadi, Mawardi Amin
|
18-32
|
PENGARUH PENAMBAHAN SERBUK ARANG CANGKANG SAWIT TERHADAP KUAT GESER LANGSUNG PADA TANAH LEMPUNG
DOI : 10.24853/jk.14.1.33-39
Dyah Pratiwi Kusumastuti, Irma Sepriyanna, Arief Suardi Nur Chairat
|
33-39
|
SISTEM DRAINASE BERWAWASAN LINGKUNGAN (ECODRAIN) DI DEPO BACK UP AREA KBN SBU KAWASAN MARUNDA
DOI : 10.24853/jk.14.1.40-50
Anom Wibisono, Eka Nur Fitriani, Paksi Dwiyanto Wibowo
|
40-50
|
PENGARUH ESTIMATING SOFTWARE UNTUK MENCAPAI KINERJA ANGGARAN YANG LEBIH AKURAT PADA KONSTRUKSI GEDUNG
DOI : 10.24853/jk.14.1.51-60
Maheswara Vidya Aditama, Budi Susetyo, Agus Suroso
|
51-60
|
PERAN PEMANGKU KEPANTINGAN TERHADAP FAKTOR-FAKTOR RISIKO PADA PROYEK KPBU JALAN TOL UNSOLICITED
DOI : 10.24853/jk.14.1.61-70
Lianda Akti Leo Puteri, Budi Susetyo, Agus Suroso
|
61-70
|
GAP-ACCEPTENCE DAN PERSAMAAN EMPIRIS PREDIKSI KECEPATAN KENDARAAN TERHADAP JARAK PENDEKAT PADA BUNDARAN
DOI : 10.24853/jk.14.1.71-78
Haryo Koco Buwono, Andika Setiawan, Trijeti Trijeti
|
71-78
|
FAKTOR-FAKTOR YANG MEMPENGARUHI TINGKAT PENERAPAN BIM (BUILDING INFORMATION MODELLING) 4D DI BUMN KONSTRUKSI
DOI : 10.24853/jk.14.1.79-87
Samrotul Fuad, Agus Suroso
|
79-87
|
METODE KESEIMBANGAN GARIS (LINE OF BALANCE) PADA PENJADWALAN PROYEK REPETITIF
DOI : 10.24853/jk.14.1.88-106
Andi Maddeppungeng, Arief Budiman, Goldhand Christopher
|
88-106
|
DISTRIBUSI SEDIMEN ARAH TEGAK LURUS PANTAI INDRAYANTI YOGYAKARTA PENENTUAN VARIABEL STATISTIK SEDIMEN PANTAI
DOI : 10.24853/jk.14.1.107-121
Kuswartomo Kuswartomo, Muhammad Satrio Wildan, Isnugroho Isnugroho, Achmad Karim Fatchan
|
107-121
|
PROYEKSI PANJANG ANTRIAN PADA BUNDARAN KELAPA GADING DENGAN MENGGUNAKAN PTV VISSIM
DOI : 10.24853/jk.14.1.122-130
Harwidyo Eko Prasetyo, Andika Setiawan, Irnanda Satya Soeratmodjo, Pungky Tarsiah Pamungkas
|
122-130
|
Penerapan Common Data Environment Berbasis Model UTAUT Pada Proyek Bendungan
DOI : 10.24853/jk.14.1.131-139
Jennika Rahmita Fatimah, Budi Susetyo, Agus Suroso
|
131-139
|
PENGARUH PERBAIKAN TANAH LUNAK MENGGUNAKAN DEEP MIXING TERHADAP BESARNYA PENURUNAN
DOI : 10.24853/jk.14.1.140-151
Mega Dwi Arthaning Tyas, Isnaniati Isnaniati, Dio Alif Hutama
|
140-151
|
DEBIT BANJIR RENCANA PADA DAS CITANDUY MENGGUNAKAN METODE HIDROGRAF SATUAN SINTETIK NAKAYASU, HASPER, WEDUWEN, MANONOBE DAN ANALISA FREKUENSI
DOI : 10.24853/jk.14.1.152-161
Jovan Putranda
|
152-161
|